Description

This is the two-week period that begins the first Iteration of Release 1 Construction phase.  So coming out of that, we need to have a picture of the entire Release 1 architecture, subject to all the things we will complete during the Construction phase (and thereafter).

Required Before Starting

  1. Input task lists (link downloads document) This will get revised during the two weeks
  2. Existing requirements and open requests/suggestions from each IPT
  3. Architecture development support tools in place:

Meeting Notes: