This is the central page for the OOI CI Release 2 LCA Review.

Quick Info: Meeting start 8:30 am at Qualcomm Room, Jacobs Hall, UCSD



On this Page

Quick Links

Introduction

This is the central page for the OOI CI Release 2 LCA Review, scheduled March 20-21, 2011 at UC San Diego, La Jolla, CA.

The LCA (Life Cycle Architecture Review) is the second milestone in the spiral development process (see CI System Engineering Methodology and CI System Life Cycle Plan). This review ends the Elaboration spiral phase for this release.

The LCA review brings together a board of representative reviewers to assess the adequate achievement of the LCA milestone, a prerequisite to moving the project into the Construction spiral phase. The scope of this review is the LCA for the first of four releases of the OOI CI.

This page and all materials will remain as a reference throughout the program.

Meeting Objectives

For all such reviews, through collaborative constructive review and critique of architectural plans and development efforts, determine whether activities associated with the previous phase are adequately complete, and that the subsystems under review are sufficiently advanced to progress to the next phase. All of the milestone reviews, along with entry criteria (deliverables for the review) and success (exit) criteria, are described in 2110-00006 System Life Cycle Plan that is available on Alfresco.

LCA Meeting Objectives

The LCA success criteria taken from the System Life Cycle Plan against which the outcome of the Elaboration phase is evaluated are:

  • Are the use cases and concepts of operation stable and complete, are are the use cases, requirements and service groups correctly linked?
  • Are designs for the candidate user interfaces sufficient to meet all of the use cases and workflows?
  • Are the baseline architecture and its interfaces stable and its interfaces stable and sufficient to meet all of the use cases and requirements?
  • Do the prototypes implement the critical use cases and demonstrate that the critical risks have been mitigated?
  • Do the baseline architecture and technology choices meet the needs of the release?
  • Are the construction execution plan, and integration and test plans, sufficient to give high confidence that production will succeed?

Meeting Materials

Collaboration Pages

During the meeting, collaborative notes will be taken on this Etherpad page (you may visit and help).

  • Meeting Notes

After the meeting, these pages will contain the material from the Etherpads.

  • Meeting Notes

Review Outcome

Subsequent to the review, the review panel compiles a review report addressing findings, open issues and a recommendation about proceeding into the elaboration phase of CI development. This publicly relevant parts of the report, and any OOI CI team responses, are available here.

  • R1 PRR Review Panel Presentation (presentation by review panel at end of review)
  • R1 PRR Review Panel Report (includes notes of in-meeting Q&A, and CI response)
  • R2 LCO Review Panel Presentation (presentation by review panel at end of review)
  • R2 LCO Review Panel Report (includes notes of in-meeting Q&A, and CI response)

General Information

March 20-21, 2012, UCSD, La Jolla, CA

See R2 LCA Meeting Logistics

Review Board

  • Chuck McGuire (RSN, chair)
  • Ian Owen (CGSN)
  • Joe Wieclawek (EPE)
  • Bill Bergen (PMO)
  • Kathy Carr (PMO)
  • Kevin Thompson (NSF)
  • Earl Davis (Pacific Geoscience Center, Canada)
  • Rob Casey (IRIS Data Management Center)
  • Frank Lind (Haystack)
  • John Caron (Unidata)
  • Ted Habermann (NOAA)

Attendee List

Last Name First Name Institution
Ampe Tim
California Institute for Telecommunications and Technology, UCSD
Arrott
Matthew
California Institute for Telecommunications and Technology, UCSD
Bauer
Rita
Scripps Institution of Oceanography, UCSD
Bergen*
Bill
Consortium for Ocean Leadership
Caron*
John
University Corporation for Atmospheric Research
Carr*
Kathy
Consortium for Ocean Leadership
Casey*
Rob
Incorporated Research Institutions for Seismology
Chave
Alan
Woods Hole Oceanographic Institution
Davis*
Earl
Natural Resources Cananda
Dean
Paul
Scripps Institution of Oceanography, UCSD
French
Bill
California Institute for Telecommunications and Technology, UCSD
Graybeal
John
California Institute for Telecommunications and Technology, UCSD
Habermann*
Ted
National Oceanic and Atmospheric Administration
Henrie
Stephen
California Institute for Telecommunications and Technology, UCSD
Hunter
Edward
California Institute for Telecommunications and Technology, UCSD
James
Mark
California Institute for Telecommunications and Technology, UCSD
Jul
Susanne
Amaryllis Consulting
Keahey
Kate
Argonne National Laboratory
Kilb
Debi
Scripps Institution of Oceanography, UCSD
Lind*
Frank
MIT Haystack Observatory
Manning
Maurice
California Institute for Telecommunications and Technology, UCSD
McGuire*
Chuck
University of Washington
McPhail
Tim
Science Applications International Corporation
Meisigner
Michael
California Institute for Telecommunications and Technology, UCSD
Moniza
Marco
California Institute for Telecommunications and Technology, UCSD
Owen*
Ian
Raytheon
Parks
Steve
Woods Hole Oceanographic Institution
Peach
Cheryl
Scripps Institution of Oceanography, UCSD
Pritchett
Bill
Consortium for Ocean Leadership
Thompson*
Kevin
National Science Foundation
Tucker
Kelly
California Institute for Telecommunications and Technology, UCSD
Vernon
Frank
Scripps Institution of Oceanography, UCSD
Wieclawek*
Joe
Raytheon

Meeting Location

UCSD, Jacobs Hall (EBU-1), School of Engineering: Qualcomm Room

Contacts

If you have any questions or concerns about the meeting, please contact Paul Dean (pdean@ucsd.edu) or Rita Bauer (rmbauer@ucsd.edu) at UCSD.

Paul Dean
Assistant Program Coordinator
Scripps Institution of Oceanography
9500 Gilman Drive.
La Jolla, CA 92093-0436
Telephone:  858-822-0878 / Fax:  858-822-4633 

Rita Bauer
Special Projects Coordinator
Scripps Institution of Oceanography
Institute of Geophysics and Planetary Physics
9500 Gilman Drive
La Jolla, CA 92093-0225
Telephone: 858-822-2946 / Fax: 858-822-337

Labels

favourite favourite Delete
Enter labels to add to this page:
Please wait 
Looking for a label? Just start typing.