compared with
Current by John Graybeal
on May 16, 2012 18:38.

Key
This line was removed.
This word was removed. This word was added.
This line was added.

Changes (2)

View Page History
* [COI Life-Cycle Objectives Milestone|syseng:COI Life-Cycle Objectives Milestone]. The LCO occurred Feb 2008 and reviewed requirements and use cases at that time.
* [COI Group FDR Preparation|syseng:COI FDR Preparation]. Preparation of individual OV2, OV5, OV7, SV1, SV2, TV1 documents and collection of related materials
* [COI Architecture Document|CIDev:CI Background Technical Materials^2430-00001_Common_Operating_Infrastructure_AD_CI.pdf] (FDR version). The integration of the individual COI DoDAF products from the FDR preparation into one uniform architecture document.
* [Integrated Observatory Infrastructure Architecture Document|CIDev:CI Background Technical Materials^2130-00002_Integrated_Observatory_Infrastructure_AD_CI.pdf] (FDR Version). Integration of all three infrastructure subsystems. Abbreviated version of the COI AD together with CEI and DM
* [CI Technology Catalog|syseng:CIAD TV Technology Catalog] (evolving based on FDR state)
* Agent Contract Network prototype [Overview|CIDev:Agent Contract Network] and [Deliverables|CIDev:Agent Contract Network CONSOLIDATED]. Research and prototyping of contracts and commitments in the context of entities(agents) within resources, as a basis for governance.